Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3948.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 07, 2009     Forward fuselage skin - (3.8 hours)       Category: Fuselage
Today I removed the forward skin and began prepping it. I cut out the cockpit recess, using snips to get within about quarter inch of the line, then a notching tool to get within 1/32", then a pneumatic rotary disk and sandpaper to get it perfect. I also removed strips of the blue plastic along the rivet lines.

Next, I removed the extra skin piece where the baggage door will go, then filed down the tabs along the edges and polished the skin edges.

I clecoed the skin back on the fuselage and began installing the instrument panel and sub-panels. I noticed right away that there's a gap between the sub-panels and the side skins (Photo 3). Just about every other RV-8 builder I've ever talked to has reported this same issue. I might be able to remedy it by building a pair of curved filler tabs, and riveting them to the side panels.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.